Bring the prices you have
Start with the amounts and prices supplied by your project team, builder or suppliers. For each item, enter the work or material, the amount needed, the unit used and the price for one unit.
Add the currency, the date of the price and what it includes. The planner uses your figures. It does not look up current market prices.
Add the other costs separately
Add delivery, site setup, running costs and any taxes that apply to your plan. If you choose to include an extra allowance, show it as a separate amount and say how you worked it out.
Check whether a cost is already included in another price. You do not want to count the same delivery charge twice.
A simple example
Example only: Your project list calls for 100 floor tiles, and a supplier gives you a price per tile. Enter 100 as the amount and enter the supplier’s price for one tile.
The planner multiplies the two figures to show that item’s total. If delivery is extra, add the quoted delivery cost separately. If it is included, record that instead of adding it again. The example quantity is not a recommendation for your building.
Know what the total means
The result shows each priced item’s total and any added costs. If prices are missing, it shows Total So Far and lists what still needs a figure. Check the entries and price dates before using the result.
This is a planning total based on your figures. It is not a quote from Cigni or a promise of what the finished job will cost.
Keep your plan and take the next step
Use the planner and download your result for free, without creating an account. Keep it ready for discussions about the work and the prices you still need.
Want a quote for Cigni’s work? Send a separate enquiry with your project details. You can use the free planner without contacting us.
A useful tool for the next step
Building Cost Planner
Open the Free Building Cost PlannerReady to take the next step?
Ask Cigni for a Quote
Ask Cigni for a Quote